Sr Master Scheduler
Albany International Corp.
- Location
- Salt Lake City, UT
- Source
- adp
- Posted
- 11/19/2026
Albany Engineered Composites (AEC) designs, develops, and manufactures advanced composite components in order to help our customers push the frontiers of innovation. Our core strength is our ability to produce highly tailored, complex composite components. With our unique blend of products – including 3D woven structures, traditional and non-traditional 2D composite structures, and discrete through thickness reinforcement technologies, to name a few – AEC is able to produce composite components and products which meet performance and cost specifications often beyond the reach of metallic or conventional laminated composites.
The Senior Master Scheduler will own the Integrated Master Schedule (IMS) for one or more of AEC's largest and most complex programs. This role is the program's objective source of truth for schedule performance. It gives the Program Management Office (PMO) and senior leadership an accurate view of execution, risk and delivery commitments.
The Senior Master Scheduler keeps the IMS current and resource-loaded, produces schedule performance metrics, and runs "what-if" analyses for leadership. The role also connects the program schedule to daily production on the floor. It works closely with Program Management, Production, Industrial Engineering, Supply Chain and Finance to spot issues early and drive them to resolution.
Essential Duties and Responsibilities
Integrated Master Schedule ownership
- Maintain the IMS in Microsoft Project so it reflects current program performance, progress and forecasts.
- Lead a rebaseline of the IMS that adds resource loading and material receipts, capturing the full program timeline and milestones.
- Keep work center–level schedule detail in the IMS so it matches how work is actually loaded and run on the floor.
- Track invoiceable milestones and Performance-Based Payments (PBPs) as separate schedule line items.
Schedule performance and analysis
- Produce and report schedule performance metrics, including SV, SPI, late starts, late finishes, CEI and BEI.
- Run "what-if" scenarios and other analyses requested by the PMO and senior leadership.
- Monitor schedule risks and issues, analyze trends and escalate when action is needed to protect milestones.
- Provide insight on how tooling and personnel constraints limit capacity and throughput.
Production floor integration
- Status work in process regularly to ensure IMS alignment with actual operations performance.
- Align the IMS with various operational execution tools, so the program schedule and the floor schedule tell the same story.
- Partner with Industrial Engineering on crew-loading work. Use the schedule to size crews to the work that is actually available and avoid overstaffing.
Material and tooling coordination
- Monitor material and subassembly availability against schedule need dates. Escalate shortages that threaten the schedule.
- Coordinate tooling inspection and repair activity, and show its schedule impact in the IMS.
Program support
- Attend program meetings and represent schedule status, risks and recovery plans.
- Answer ad hoc schedule requests from the PMO, customer-facing teams and leadership